ETAR refurbishment For dairy factory in Portugal 300 m³/day

Project details:

Sector: Dairy Year of execution: 2004 Location: Portugal

Project description:

Pre-treatment in rotary sieve – neutralisation – homogenisation in the existing pond, which will be aerated with diffusers and a small blower. Physical-chemical treatment will then be taken to the biological basin using, in turn, the existing decanter + sludge dewatering by Filter Press.