Stormwater Treatment Plant (WWTP)

Pre-treatment of rainwater by means of a channel conveyor screen in a double chamber

Project details:

Sector: Wood industry Year of implementation: 2017 Location: Portugal

Project description:

Pre-treatment of rainwater by means of a channel conveyor screen in a double chamber. After this, the stormwater flow to be treated will be conveyed to a hydrocarbon separator made in civil works, and then to a pumping well, where the water will be pumped to a rotating screen. The project also includes: cleaning of the WWTP site, installation of buried pipes, technical assistance and installation of the electrical panel and automation.