Reform of WWTP Pre-cooking Plant 580 m³/day

Project details:

Sector: Food sector Year of execution: 2013 Location: Navarra

Description of the project:

Replacement of the sieve with another HPS type, dissolved air flotation system, Installation of an electromagnetic flowmeter, tank for transferring the sludge from the float outlet, followed by pumping and a storage tank. Includes plant control system.