ETAR in cheese factory treating 500 m³/day

Project details:

Sector: Dairy Year of execution: 2017 Location: Palencia

Description of the project:

It consists of screening as pre-treatment, then we have homogenisation to laminate the flow that goes to the dissolved air flotation system. Then we have the biological treatment in CBR in two tanks, designed for possible expansion with a decanter modifying it to SBR. Finally, a sludge dewatering system in a filter press.